Shancheng District, Hebi, Henan, China

ISO 9001 · ISO 14001 · ISO 45001

Manufacturing

Manufacturing & Quality

Rolling, welding, machining and assembly in one facility — then a trial run before the equipment is loaded.

One facility, four production steps

Our workshops in Hebi handle the whole build: plate rolling and welding for vessel shells and frames, machining for shafts and drive components, assembly of the aeration and turning equipment, and the trial run before dispatch. Overhead cranes move the heavier assemblies between bays, which is what makes it practical to build large vessels indoors rather than on site.

Because the fabrication and the machine shop are in the same place, a change in a flange, a bearing seat or a duct connection is resolved inside our own process. It does not become a negotiation between a tank supplier and a separate equipment vendor.

What quality control covers

Quality control follows the sequence of the build, not a single inspection at the end. Drawings are released against the approved configuration, incoming plate and bought-in components are checked before cutting, dimensions and weld quality are inspected at each stage, and complete units are run before they are packed.

The management system behind this sequence is certified to GB/T 19001-2016 / ISO 9001:2015, with environmental management to GB/T 24001-2016 / ISO 14001:2015 and occupational health and safety to GB/T 45001-2020 / ISO 45001:2018.

Dispatch and installation

Equipment is packed for sea freight with a loading plan and packing list. Larger vessels are shipped in sections where transport limits require it, and the drawings that come with the shipment show how the sections are assembled on site. Our team supports installation with documentation and, where the project calls for it, site guidance.

Welding a vessel section in the Donghai fabrication shop
Vessel fabrication, Hebi workshop

Process control

Four checkpoints between drawing and dispatch

Every order moves through the same sequence. Nothing leaves the workshop without the documentation that goes with it.

  1. 01

    Drawing and material review

    The engineering drawing is released against the approved configuration, and incoming plate, profiles and bought-in components are checked before cutting begins.

  2. 02

    In-process inspection

    Dimensions, weld quality and fit-up are inspected at each stage rather than at the end, so corrections happen before assembly closes up.

  3. 03

    Assembly and trial operation

    Drives, aeration equipment and controls are fitted and run before dispatch. Any adjustment is made in our workshop, not on your site.

  4. 04

    Packing and documentation

    Equipment is packed for sea freight with a loading plan, packing list and the operating documentation needed for installation.

Project inquiry

Request a quote

Tell us about the feedstock, capacity and site. We reply with a configuration proposal, not a generic brochure.

Feedstock type, daily tonnage, site location and timeline are the most useful details.